Associate Anita Peri recently spoke on a panel at the University College London on financing the green transition and the pressures facing net zero investment globally.
She shares below a few of the key takeaways which emerged from that panel discussion.
- Legislative certainty is the foundation of every bankable project, but it looks different in different regions (and finding a way to manufacture it matters as much as having it written into the law). In markets like Central Asia, where the legal framework for projects is still developing, sponsors and lenders have found ways to replicate legislative certainty through other means: for instance, presidential decrees protecting land rights, sovereign-backed credit support instruments overriding single-buyer credit risk, and government support agreements with clear undertakings from the host government that offer a substitute for a mature regulatory environment.
- Expansion of generation capacity in the context of a more general unbundling of the electricity sector can create challenges. The separation of generation, transmission and distribution responsibilities is intended to create a more dynamic and efficient market. Kazakhstan has had a more liberalised sector for many years and Uzbekistan is headed in that direction. In the wider context of developing IPPs and attracting foreign debt and equity investment, these structures need to ensure they are designed to support these sorts of investments, which requires clear rules, an established, transparent and fair decision making process, proper dispute resolution mechanisms and responsiveness.
- Development banks are indispensable partners in Central Asian project finance, and not merely lenders of last resort. Their role extends well beyond concessional financing: they shape auction processes, prepare bankable documentation, advise governments on transaction structures, and create standardised templates that allow international banks to support projects with confidence. This replicability is a significant competitive advantage for the region; for instance, lenders entering one of the more mature Central Asian markets today, such as Uzbekistan, know broadly what they are getting into, which accelerates deal execution.
- The quality of the offtaker remains the central credit question. As markets liberalise, investors will need to understand the regulatory framework that supports the single buyer, to ensure that it is creditworthy and is able to generate revenues in order to discharge its obligations under the power purchase agreements. Development banks seek to support the sector by offering support for the sovereign payment obligations which sit behind the offtaker. For clients evaluating projects, the robustness of this backstop remains a critical diligence question.
- Multilateral guarantees and political risk insurance help as bridging tools, and are most valuable in early-stage markets where there is momentum towards reform. These products work best not simply as payment guarantees, but because the institutions that sit behind them (such as the World Bank, EBRD and ADB) bring vast amounts of experience and credibility and therefore add confidence to the market. For Central Asian markets that are still developing their regulatory frameworks, accessing these products can be a strong signal of their commitment to the project. However, they are transitional: long-term private capital will only flow at scale once cost-reflective tariffs and stable regulatory regimes are established in their own right.
- Mispriced auctions are self-defeating – a lesson which is also relevant to the region’s expanding renewable energy programmes. The UK’s 2023 offshore wind auction, which attracted zero bids when “strike prices” (i.e. the guaranteed fixed price that low-carbon generators will receive over the offtake term) failed to reflect (and fell far short of) real costs, is an instructive parallel. Egypt experienced the same dynamic before recalibrating its tariff model, after which its Ben Ban solar programme was heavily oversubscribed. As Central Asian governments scale up their renewable auction rounds, ensuring that pricing reflects the genuine risk profile of each market, rather than benchmarking against more developed economies, will be decisive in determining whether those rounds succeed.
Our award-winning project finance team has built a robust presence across Central Asia, having advised on more than 50 transactions in the region over the past decade – including advising on Uzbekistan’s first ever large-scale, privately procured, limited recourse project financing. We have 15+ years of experience working on deals in the CIS region and we are currently mandated on over 20 deals. With our experience, we are ideally placed to support on transactions in the region.